Size and Separation
Additional Requirements

Number of ADUs Allowed in Calabasas

In Bell you can build up to one ADU (either attached or detached) and one JADU on single-family property.

Multifamily property owners in Calabasas may convert at least one ADU, and additional ADUs not to exceed a maximum number equal to 25% of the existing units out of existing uninhabitable space. Ergo:  

 

  • From 2 to 7 units, you could convert existing uninhabitable space into one ADU
  • From 8 to 11 units up to 2 ADUs
  • From 12 to 15 units up to 3 ADUs
  • And so on.


No more than two detached ADUs may be constructed on a multifamily lot in Calabasas.

Modern ADU on Nashville Street in Los Angeles with open-concept kitchen and dining area.

ADU Calabasas – Size & Building Constraints

In Calabasas, the maximum size for a detached ADU is 1,200 square feet.

In Calabasas, the maximum size for an attached ADU is 1,200 square feet.

In Calabasas, detached ADUs are limited in height to 16 feet. An attached ADU can be up to 25 feet or the height of the main dwelling unit, whichever is smaller.

An attached ADU may be two stories in Calabasas. However, due to height restrictions you cannot build a two-story detached ADU in Calabasas.

No, stacked ADUs (one ADU on each floor of a two-story structure) are not allowed in Calabasas.

No, two ADUs attached together are not allowed in Calabasas.

No, a JADU is defined as an ADU converted from existing space within the main structure of the primary dwelling unit. As such, it cannot be attached to an ADU.

Roof decks are not prohibited for ADUs in Calabasas. However, California building safety codes about roof deck safety railings apply, and the height of the railing applies to the total height of the building, so the whole structure including the railings must comply with ADU height requirements. California requires that deck rails be 36 inches high on residential dwellings, 42 inches high on multifamily dwellings.

The exterior of the ADU must align with the architectural and aesthetic style of the rest of the neighborhood, using similar materials and design elements to maintain consistency with the main dwelling unit and surrounding dwellings.

ADU Gallery 4

ADU Setbacks in Calabasas

The City of Calabasas requires 4-foot rear and side setbacks for new-construction ADUs. ADUs converted from existing structures may be exempt.

The City of Calabasas requires a minimum of 6 feet of separation between the new ADU and any other structures. ADUs converted from existing structures may be exempt.

No, ADUs are not allowed in the front yard of residential property in Calabasas.

Additional Requirements in Calabasas

No, you can also submit your plans to the Building & Safety Division through their online ePlan submission form.

Calabasas may require a soils report for ADU permitting to make sure the soil can support the new structure, especially if the ADU will be located on a hillside, an area with significant grading, or if there are special foundation requirements.

While not setting a percentage, Calabasas requires that property maintain “sufficient” open and permeable space on the lot. 

The plan check requires a review by the Planning Department and the Department of Building & Safety for zoning, building standards, and safety compliance. The process takes approximately 6-8 weeks.

Parking for Calabasas ADU

Calabasas typically requires one additional parking spot per ADU be added to the property. However, if the property is located within a half-mile of a public transit stop, it may be exempt from this requirement. ADUs converted from an existing garage or carport are also exempt from this parking requirement.

If a parking space must be added, it can be included on the driveway or configured as tandem parking.

Revere Pl - Culver City 1

Additional City of Calabasas ADU Regulation Resources

Per Title 24 of the California Energy Code, solar panels of appropriate size and capacity are mandatory on new-construction ADUs. ADUs built from converted existing structures are exempt, as may be ADUs located under significant shading. Smaller ADUs may be subject to reduced or modified solar panel requirements.

An ADU is not required to have a separate water or electrical meter. You can opt for the ADU to share service with the main dwelling unit. However, you can request separate water or electrical meters from the City of Calabasas.

Calabasas does not automatically assign a new ADU its own address. However, it may assign the ADU a new address if it is intended for rental or independent occupancy. The ADU will usually get a “½” designation — for example, an ADU located behind 1234 Pine Street would have the address “1234½ Pine Street.”

Low Impact Development (LID) is an approach to land development or redevelopment that seeks to preserve and conserve onsite water quality and natural features, with minimal detrimental effect to local waterways and ecosystems. Calabasas may require LID fees for larger ADUs.

No, Calabasas does not allow residents to use an ADU as an Airbnb or short-term rental (30 days or less).

Per the Costa-Hawkins Act of 1995, Calabasas does not impose rent control on dwellings constructed after February 1, 1995. This means most new-build ADUs are exempt. However, if the primary dwelling unit is subject to rent control, it might apply to the ADU as well.

While encouraging the use of electric appliances for efficiency and sustainability, Calabasas does not prohibit gas appliances in new ADUs.

In Calabasas you are only required to install sprinklers in a new ADU if the primary dwelling unit has them as well. You may also be required to install them if the ADU is located within a special fire hazard zone.

Have Additional Questions?

Visit our comprehensive FAQ page for more information.